ANNOUNCEMENT ABOUT HYDRAULIC TESTING OF HEATING MAIN FROM ALMATY TPP-2 TO CENTRAL THERMAL POINT OF ZTK JSC ALES

May 4, 2016 from 8 a.m. untill 5 p.m. hydraulic test of the heat main Du-800 from Almaty TPP-2 (located at the address: Almaty, Alatau district, Algabas microdistrict, street 7, house 130) to the Central thermal distribution point of the Western Thermal Complex of JSC AlES (located at: Almaty, Auezov district, Tole Bee street, house 308).

In this regard, Joint Stock Company "Almaty Electric Stations" asks all residents in the test area (Algabas microdistrict Aksayskaya St., Margulana Street, Trudovaya Str., Altyn Besik microdistrict, "Aksay 3" microdistrict, microdistrict " Aksay 3A, Aksay 3B microdistrict, Aksay 2 microdistrict, Saina street (between Tole bi street and Kabdolov street), the area west of the Central international bus station "Sayran" (between Sain street and Uteneg batyr street)) observe the safety rules, be careful not to cause serious injury if there is a possible damage to the heating main.

To avoid possible accidents, heads of enterprises and organizations need to withdraw people from the area where heating main being tested.

Additional information can be obtained by calling JSC AlES - 8- (727) -227-70-21.

Monday, 11 July 2016