Available thermal power of CHPP-3

The structure of JSC "Almaty Power Plants" includes the production department of CHPP-3, located in the village of Otegen Batyr, the installed thermal capacity of CHPP-3 is 335 Gcal/hour. The actual average annual heat load of CHPP-3 is 10.9 Gcal/hour, in terms of the design temperature (-27ºC), the heat load will be 60.4 Gcal/hour. As of 01.04.2024 the reserve of available heat capacity is 274.6 Gcal/hour.